All Categories

Nagano Japan Customer’s order of 200L oil heating brewhouse system has been finished perfectly.

Time: 2022-04-02 Comment: 30

NaganoJapanCustomer’s order of200L oil heatingbrewhouse systemwhich is waiting to be sent isfinish perfectly. Before shipment, we test thecomplete systemwith water, ensuring the equipmentworks well and safely.For the 400L fermentation tank and 100Lbeer brite tank this time,always asCoff hasthought by customer's side, we install liquid level meter and designliquid levelbaffleso that user cantake volume notes for the fermentation tank.

WeChat53f976669f113d3d8d0f39a348b437af